Upload your floor plan. AI reads every wall, classifies exterior vs interior, and generates a complete material schedule: hemp blocks, lime binder, panels, render coat, installed weight. Ready to send directly to your supplier. What a quantity surveyor charges AUD $800–$2,500 for. You get it instantly for AUD $97.
02
Carbon Calculation Report
Your hempcrete walls store real carbon. This tool calculates exactly how much: sequestered CO₂, net carbon balance, avoided emissions versus conventional construction. The output is a formal Carbon Calculation Report prepared by a qualified engineer, accepted by banks for green finance applications, councils for green building submissions, and ESG auditors for sustainability reporting. Your client may use it to pursue carbon credits or green mortgage benefits.
Material Take-Off AUD $97 · Carbon Calculation Report AUD $499 · Both delivered instantly
See the report before you pay.
Download a complete sample report: same format, same data, same PDF your clients receive. Enter your email and we send it instantly.
Full material schedule, all rows unlocked
Block count + panel count + slab volumes
Supplier split + shipping estimate
Branded PDF with engineering sign-off
Your email is added to the HempLime Engineering newsletter. No spam. Unsubscribe anytime.
HempLime Takeoff
Upload your floor plan drawings, all floors. AI reads every sheet, classifies exterior vs interior walls, and sums across all levels. Then hit Generate report.
Step 1: Upload floor plan drawings (all floors)
📐
Drop drawings here or click to browse
JPG · PNG · PDF · Multiple sheets accepted
● Upload ALL floor plan sheets (Ground Floor, Level 1, Level 2 etc.) — AI will extract each floor separately and sum totals
Step 2: Wall specification
Step 3: Project details (appears on report)
HempLime Takeoff
Full Material Schedule Report | hemplimeengineering.com
ⓘ Plumbing point counts are based on AU standard fixture rules. Pipe routing and HWS sizing require hydraulic engineer drawings.
Electrical — Provisional Allowance
Item
Basis
Qty (ea)
ⓘ Electrical quantities are standard provisional allowances based on room count. Final quantities require electrical engineering drawings. Switchboard, solar, and EV charging not included.
Sign-off
Ramon Granados · Civil & Environmental Engineer · Hemp Engineering Pty Ltd · ABN 54 630 152 457 hemplimeengineering.com · [email protected] · +61 449 947 699 Engineers Australia Contact ID 3539351 · Washington Accord · BSc Civil & Environmental Eng.
Browser opens print dialog → select "Save as PDF"
IMPORTANT: In the print dialog, click "More settings" and turn ON "Background graphics" — otherwise the green header will print white.
Why AUD $97? Because it is 10% of what you would otherwise pay.
What a take-off costs in Australia
Certified Quantity Surveyor$800 – $2,500
Drafting / estimating firm$500 – $1,500
Builder's estimator (4–8 hrs)$320 – $1,200
What we charge
10% of professional QS rateAUD $97
AI reads drawings in seconds✓
Full schedule + PDF instant delivery✓
A note on API costs
Every drawing you upload is processed by the Anthropic Claude AI Vision API, which we are charged for. We are transparent about this. The AUD $97 report fee covers API processing costs, engineering quality oversight, and PDF delivery. It is the most affordable professional HempLime take-off available anywhere in Australia.
Simple pricing. No subscriptions unless you want one.
Peer Review — By Invitation
AUD $0 / one report
For engineers, architects, and builders invited to review this tool before commercial launch. Personal coupon code only — not a public offer.
Your hempcrete walls store real carbon. Now you can prove it, and get paid for it.
Every kilogram of hemp hurd embedded in your walls has absorbed CO₂ from the atmosphere during the plant's growth. That carbon is now locked permanently in the building. This is not a claim. It is a measurable, quantifiable, engineering-verified fact.
This Carbon Calculation Report tells you exactly how much CO₂ your project stores, what it avoids compared to conventional construction, and what that means in financial terms. Banks offering green finance products need this data. Councils processing green building applications accept it. ESG auditors use it for sustainability reporting. And your client may use it to pursue voluntary carbon credits through registered markets.
Enter your project parameters below. The calculator runs instantly. The formal report is prepared by a qualified Civil and Environmental Engineer and delivered within 48 hours.
Emission Factors (peer-reviewed): Hemp hurd sequestration: 1.80 kg CO₂e per kg (Arehart et al. 2020, Journal of Cleaner Production; Pervaiz 2003) | Hydraulic lime embodied carbon: 0.90 kg CO₂e per kg (EuLA 2019 / IPCC 2006) | Conventional wall reference: 120 kg CO₂e per m³ (ICE Database v3.0, Bath University)
Carbon Calculator: One Step from Your Takeoff Report
Data pulled automatically from your material schedule above
Hempcrete Volume
Run takeoff first ↑
Total Wall Area
Run takeoff first ↑
Mix Ratio
65% hemp / 35% lime (standard)
Used to calculate transport embodied carbon
CO₂ Sequestered in Hemp
–
tonnes CO₂e stored permanently
Embodied Carbon (Lime + Transport)
–
tonnes CO₂e emitted
Net Carbon Balance
–
tonnes CO₂e (negative = carbon sink)
Avoided vs Conventional Construction
–
tonnes CO₂e saved
Carbon Intensity per m²
–
kg CO₂e / m² wall (negative = sink)
Your Build vs Conventional Construction
Conventional
–
Your HempLime
–
What Your Carbon Numbers Mean in Real Terms
🚗
–
cars off the road for one year
✈️
–
Sydney–London return flights offset
🌳
–
trees absorbing carbon for 10 years
🏠
–
years of avg Australian household emissions
⚡
–
MWh of coal power generation avoided
📋
–
indicative voluntary carbon credit units
Methodology: Hemp hurd sequestration: 1.80 kg CO₂e/kg (Arehart et al. 2020; Pervaiz 2003). Hemp hurd density: 110 kg/m³. Hydraulic lime: 0.90 kg CO₂e/kg (EuLA 2019). Transport: 0.10 kg CO₂e/tonne-km. Conventional reference: 120 kg CO₂e/m³ clay brick (ICE Database v3.0). This is an indicative engineering estimate. It does not constitute a certified Life Cycle Assessment. For formal green finance, council, or ESG submissions, a Carbon Calculation Report prepared by a qualified engineer is required.
Get Your Formal Carbon Calculation Report
These numbers are indicative. A Carbon Calculation Report prepared by a qualified Civil and Environmental Engineer is the document your client needs to present to banks, councils, ESG auditors, and carbon registries.
Full carbon balance with cited peer-reviewed methodology
Suitable for green finance applications and green mortgage submissions
Accepted for council green building rating programs
ESG-ready for developer and investor sustainability reporting
Foundation document for voluntary carbon credit registration pathway
Branded PDF with engineer reference, delivered within 48 hours
AUD $499
Prepared by Ramon Granados, Civil & Environmental Engineer · 35+ years EPCM experience · Hemp Engineering Pty Ltd ABN 54 630 152 457
Built by Ramon Granados — Civil & Environmental Engineer · 35+ years · Part of the PMT behind $100B+ in complex industrial assets Hemp Engineering Pty Ltd · Perth, Western Australia · hemplimeengineering.com